The West Erregulla Gas Project (WER) includes the processing of gas from upstream wells and transport of the gas to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The Proposed Action includes:
- A gas processing facility (WEF), with a nominal design flow capacity of 87 terajoules per day (TJ/d);
- A 16.5 km interconnecting buried gas pipeline between the WEF and the DBNGP tie-in point at MLV 93(WEP);
- A custody transfer metering facility located at the tie in to the DBNGP;
- Vegetation clearing of up to 90 ha of land to support the above infrastructure; and
- Supporting infrastructure proposed to include but not limited to accommodation, power generation, flare system, water treatment package, back-up diesel system and communications.