Health Safety and Environment
Safety first, and always
With safety the highest priority at AGIG, we are continually striving to achieve Zero Harm. We believe that all incidents are preventable, and so we continually review our work practices and monitor our performance to ensure the ongoing safety of our employees, customers and the public.
To achieve Zero Harm, we work to:
- Maintain public safety through safe pipeline operations
- Provide a safe and healthy workplace, free of occupational injuries and illness
- Create a culture and environment where every employee is personally committed to managing health and safety
- Act consistently with AGIG’s values, including working in a safe and professional manner
We maintain a strong, focused safety culture that reinforces and strengthens the business. Comprehensive policies, procedures and training support a Zero Harm work environment.
Learn more about our approach to Zero Harm:
The Environment
AGIG recognises its responsibility to conduct business in a way that protects and improves the state of the environment for future generations. We understand that the long-term well-being of society, the well-being of employees and the strength of our business depends on our commitment to a sustainable environment.
AGIG is committed to working with relevant regulators and community stakeholders to ensure that its activities are conducted in a manner that minimises environmental impacts to as low as reasonably practicable. This includes operating in a manner that promotes energy and materials conservation, as well as waste reduction.
For a number of years, AGIG has been working in conjunction with Landcare to support a range of environmental projects. This has included delivering trapping and baiting supplies to the Yaburara and Coastal Mardudhunera Aboriginal Corporation (YACMAC) to eradicate feral cats in the Fortescue River Mouth region and ultimately relieve the threat of predation on nesting turtles and threatened Northern Quolls in the area. Additional support has been provided through similar projects across WA in the Mid West, Wheatbelt and Peel regions to assist local landholder groups.
Environmental Documents:
DBNGP
Kemerton Lateral Gas Pipeline (MS704) Documents:
DBNGP
DBNGP South Looping Project Loop 10 (MS708) Documents:
DBNGP
Northern Looping Project, Loops 1 To 9 (MS710) Documents:
DBNGP
Stage 5 Expansion (MS735) Documents:
- E-REP-083 MS735 DBNGP Stage 5 2022-2023 Annual Compliance Report
- E-REP-067 MS735 DBNGP Stage 5 2021-2022 Annual Compliance Report
- E-REP-197 MS735 DBNGP Stage 5_5-year Performance Review Report (2017-2022)
- E-REP-020 MS735 DBNGP Stage 5_5-year Performance Review Report (2012-2017)
- E-REP-196 MS735 DBNGP Stage 5_5-year Performance Review Report (2007-2012)
- E-PLN-016 DBNGP Stage 5 Expansion - Rehabilitation Management Plan
- E-PLN-015 DBNGP Stage 5B Expansion - Construction Environmental Management Plan
Pluto Northwest Shelf Interconnector Pipeline
(MS1117) Documents:
- E-PLN-066 PNI MS1117 Compliance Assessment Plan
- Pluto – NWS Interconnector Pipeline Project Cultural Heritage Management Plan
- E-PLN-065 Pluto-North West Shelf Interconnector Construction Environmental Management Plan
- E-REP-198 PNI MS1117 Annual Compliance Assessment Report 2023
- E-REP-082 PNI MS1117 Annual Compliance Assessment Report 2022
- E-REP-062 PNI MS1117 Annual Compliance Assessment Report 2021
- E-REP-054 PNI MS1117 Annual Compliance Assessment Report 2020
- E-STU-080 Burrup - Pluto-NWS Interconnector Targeted Flora and Vegetation Survey
- E-STU-079 DDG Burrup Interconnector Pipeline Flora & Fauna Survey 2018
Tanami Gas Pipeline
Environmental Documents:
- E-REP-089 Tanami Annual Compliance Report EPBC 2017-7997 (2023-2024)
- E-STU-065 Tanami Rehabilitation Monitoring Report 2024
- E-REP-199 Tanami Annual Compliance Report EPBC 2017-7997 (2022-2023)
- E-REP-069 Tanami Annual Compliance Report EPBC 2017-7997 (2021-2022)
- E-REP-059 Tanami Annual Compliance Report EPBC 2017-7997 (2020-2021)
- E-STU-083 Tanami Gas Pipeline Rehabilitation Monitoring 2023
- E-STU-082 Tanami Gas Pipeline Rehabilitation Monitoring 2022
- E-STU-065 Tanami Gas Pipeline Rehabilitation Monitoring 2021
- E-REP-047 Tanami Annual Compliance Report EPBC 2017-7997 (2019-2020)
- E-PLN-026 Tanami EPBC 2017/7997 Construction Environmental Management Plan
- E-PRO-023 Tanami Gas Pipeline: Trench Clearing Procedure
- E-PLN-067 Tanami Night Parrot Management Plan
- E-PLN-027 Tanami Rehabilitation Plan
- E-REP-035 Tanami Annual Compliance Report EPBC 2017-7997 (2019-2020)
- E-STU-081 Tanami Survey for Night Parrots Habitat Assessment and Acoustic Survey 2018
- E-STU-058 Tanami Gas Pipeline Rehabilitation Monitoring 2020
Tubridgi Gas Storage
Environmental Document: